Our 28-day FR5 unloading ticket has a paused connector on video but no agreed lead-in; which occurrence details should the technician specify before we capture another stationary arm?
Ask for the waiting step, expected ordinary state and preceding transitions against your installed job and fixture. Have them confirm the export window includes those, with one occurrence identity shared by the video and trace.
Technician identified the receiver-seated wait and requested its earlier changes; our current export starts after the loss, so I have asked the recorder owner to check the revised window before the next supervised occurrence
Can the covering shift perform that export using the revised instruction? The capture plan should work when neither you nor the recorder owner is beside them.