How will I know the FR10 delivered one supported panel?

HanaBrown0883 · 2026年6月10日 05:46 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HanaBrown0883
Supplier report says the vacuum tool seals on our light access panel. The real panels come from a stack, and I still need the support and single-panel delivery explained. What should I ask them to demonstrate before we accept the tool?

16 条回复

NO
NoraAli0235

Was that report from one loose panel, or a pickup from your stack?

18分
HA
HanaBrown0883

One loose panel on a bench. No stack trial shown.

10分
EL
EllaAllen0294

I would compare manual preparation as one option. If someone can present separated panels at another station, that may reduce the automatic separation work, though their time and space need to be included.

7分
IS
IsaacAllen0346

That doesn't remove the need to know one panel arrived. A person can put two down too. I'd still ask how the proposed system detects a doubtful delivery.

21分
EL
EllaAllen0294

Agreed about the check. I was suggesting another way to feed the tool, not counting a person's preparation as proof of one panel.

15分
ZA
ZaraBarnes0569

Our sample sheets had interleaves and a little oil between some layers. No idea whether yours do, Hana, but I'd send stack conditions as well as panel dimensions. The lovely loose piece misses all that.

14分
CA
CalebChan1102

Can maintenance reach each cup without stripping the whole tool?

19分
YA
YasminAdams0093

Support deserves its own trial as well, since a panel that stays attached can still bend enough to arrive badly positioned in the receiving fixture.

17分
HA
HarishCarter1011

Include the receiving supports in the demonstration, so release is checked where your panel will actually land.

15分
HA
HanaBrown0883

Zara, our stack does have interleaves; I missed them in my description. Caleb, no cup-access detail yet. I have asked for the stack and receiving fixture to be included.

17分
SA
SarahBennett0763

Who removes those interleaves in the proposed process? It may be a separate task from separating panels, and the person doing it needs an agreed place to work.

8分
CH
ChrisBowen

I'd also have the integrator show the response to a double-panel indication or uncertain reading. Actually, show the recovery workflow too, not just a lamp in a demonstration.

17分
PR
PriyaChen1177
回复 ChrisBowen

Don't assume a double-sheet sensor can simply be bolted wherever there is spare room. Ask the supplier to validate its proposed check with these panels and surfaces. I don't know enough about your coating to pick a method from here.

11分
BE
BenBrown0892

I'd ask about worn cups and the cleaning routine while they're designing it. Those affect who gets called when the same stack stops behaving, even if the new-tool test goes well.

11分
HA
HanaBrown0883

Sarah, manual interleaf removal at a separate preparation position is now one priced option. Stack trials and the single-panel check are still to be defined. Thanks for making that hidden task explicit.

6分
YA
YasminAdams0093

Will you return with the support result when a representative transfer is tested, Hana, particularly whether the panel stays suitable for that receiving fixture?

15分