FR10 ready arrow with two different waiting points

SaraAllen0287 · 2026年3月23日 21:23 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

SA
SaraAllen0287
Our machine supplier calls ready request received, while the FR10 integrator reads it as permission to begin the loading stage; I put both sequence drawings together and they wait at different points under the same arrow, so who should bring the definitions and clearing conditions into one agreed interface?

0 条回复