Our FR10 panel proposal has a bench seal result on a single supported aluminium sheet. Normal supply is stacked, with some bow. The report does not establish single-panel delivery or support during transfer into the locating tray. I have left those items open in the tooling review.
Ask for representative stack tests and an explained single-panel check. Include what happens with an uncertain result, plus supported transfer and release. Otherwise the same seal report may keep answering questions it never tested.