简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

our bracket completion gets counted again after reconnect

RaviBaker0476 · 2026年6月16日 16:07 UTC

回复讨论
RA
RaviBaker0476
FR10 monitor reconnects and counts the retained completion again. How do I reconcile its job without clearing evidence or submitting another check?

1 条回复

BE
BethBrown0933

What links the retained result to an identified inspection attempt, and what processed history survives your monitor restarting? I'd compare those before treating a high signal as new work. If the link is missing, leave the result for review rather than manufacture another inspection.

7

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。