I'm trying to develop our inspection result parsing application offline while the cell is unavailable. It normally uses Universal Robots UR5e in a fixture inspection station, with a reference housing as a reference. Our mock returns true for every method, keeping the screen happy without checking the interface properly.
I need software response testing, with no claim to physical simulation.
Where should a software mock stop? (inspection result parsing)
PavelArcher0353 · 2026年5月22日 04:08 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文