Our steel-blank loading sketch reaches the fixture but leaves out the gripper and open door, so I cannot use it to explain the proposed cell to operators; what should I ask the supplier to include before anyone selects a base position?
The complete proposed tool holding the blank, with adapter and service fittings, through entry and withdrawal. Include the actual machine opening and open-door fittings. Have the setter review fixture changeover access from that same layout.