Our proposed FR5 fixture exchange reaches the brass blank on paper, but the open machine door and complete gripper are absent; what exactly should the integrator add before we choose the base position?

17 条回复

DA
DavidBarnes0606
回复 HugoBailey

Add the measured open door and the complete loaded tool, then follow the whole approach and exit rather than joining the base to the pickup point with a line

4
HU
HugoBailey

The toolmaker has a gripper body drawing but the adapter and hose fittings are still being chosen; can this review start before those are final?

23
MI
MinaBell0685
回复 HugoBailey

Yes, as a preliminary comparison with the uncertain dimensions marked. It can reject a cramped position. It cannot approve the final installation while parts of the tool are still missing.

17
HU
HugoBailey

Understood; I have asked for two candidate positions with those uncertainties shown, not a released stand drawing.

14
CH
ChloeBrooks0831
回复 HugoBailey

Has someone measured the actual open door, including its handle?

18
RE
ReeceBell0645
回复 HugoBailey

Do either of the proposed positions obstruct the machine service panel? Its removal space matters too, not only the front face shown in a plan view.

19
HU
HugoBailey

Chloe, the fitter has now measured the door and handle; Reece, the second position is beside the service panel, so its removal space is on the review list.

21
EL
ElliotBennett0770
回复 HugoBailey

We saved reach on one layout and paid for it every time maintenance brought a trolley in. Include where the tools and removed parts actually go during service.

18
TH
TheoBaker0497
回复 HugoBailey

Loaded withdrawal and empty return both included?

23
IM
ImranAllen0305
回复 HugoBailey

Show how the blank is held at each stage as well. A drawing of the gripper beside a separate blank leaves the toolmaker and integrator free to imagine different grip depths, even if both drawings are individually accurate.

19
HU
HugoBailey

Theo, both routes are requested; Imran, toolmaker and integrator now have the same held-blank drawing, although the fittings remain provisional.

16
MI
MinaBell0685
回复 HugoBailey

That is enough to keep comparing, with the provisional fittings visible. Has either base position already failed on the measured door or service space?

10
HU
HugoBailey

The second position blocks panel removal, while the first needs a different loaded exit around the door; neither is ready to approve.

20
EL
ElliotBennett0770
回复 HugoBailey

Could the first position keep decent service access if that exit can be solved? I'd rather spend drawing time there than pretend the panel will never come off.

3
HU
HugoBailey

Yes, maintenance prefers the first position for access, and the integrator is reviewing its exit with the complete proposed tool before we commit to it.

10
HU
HugoBailey

Thanks, Reece, for the panel question; it removed an option that the reach sketch made look very attractive.

11
TH
TheoBaker0497
回复 HugoBailey

Post the exit result when the fittings are settled.

7

讨论已关闭