Our angle-bracket notes look aligned in the fixture and fail the drawing after release. Correction appears before acceptance with little explanation. I need the old fit-up, fixture-location and final checks separated before we specify the new FR5 welding cell. What was actually measured at each stage is still unclear.
In my review the restrained entry was a fit-up gauge check and final inspection used drawing datums, so subtracting them would have invented a movement; establish your references, drawing revision and support conditions first, then retain the correction as recorded work without assuming its need, amount or suitability for the new cell is proved.