Which FR5 tool details should join our mill-door measurements?

HenryBennett0699 · 2025年12月13日 23:09 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HE
HenryBennett0699
Our mill survey is finally usable, but the FR5 proposal still shows a polymer blank without the gripper around it. Which complete-tool information should I request so the integrator can assess the exchange?

1 条回复

CA
CalebCarter1015

Ask for the body, fingers in the relevant open and closed states, adapter and connections, with the blank at its intended grip position. I'd want them assessed through entry, placement or pickup, withdrawal and return against that surveyed machine. The person changing the fixture still needs a usable route too.

14分