Put one of those mixed orders through both plans on paper first. Include where the remaining cartons wait and who finishes that pallet. Cheap enough to discover a job nobody has priced.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Cannot choose our UR5e pattern while the manual exception keeps growing
DavidBarnes0606 · 2026年1月3日 07:32 UTC
18 条回复
I've done one with dispatch and the manual remainder uses the same operator who would refill the robot station, so the two jobs overlap rather than replace each other
11分That doesn't necessarily kill it. Could you group the stable orders and leave the mixed ones on the existing bench? I'd compare that before trying to make one cell swallow every order type.
14分Theo's split might work, but David, how many of the stable orders are actually released together? A schedule can look wonderfully regular after somebody has rearranged the past to suit it.
11分I like the split idea. Didn't mean my paper walk-through had to use the most awkward order as the whole business case, just wanted the extra work visible.
15分And don't move promised dispatch times to make a tidier robot queue.
10分Anika, I meant use the order groups they actually have, not change promises. On our packing work the stable repeat job was worth isolating. The mixed one wasn't. Different answers in the same room, which annoyed the people wanting one headline.
7分Ada, not many are released together; the order list I first used was sorted by carton type rather than release order, so it made that split look easier than it is
21分That's the sheet I'd fix first.
20分I have restored release order and kept the dispatch cutoffs; the stable groups are smaller now, and the operator still moves between refilling and finishing mixed pallets
5分Thank you for checking that. You can still ask whether a modest stable workload justifies the equipment, but it deserves to be costed as that workload rather than the much larger sorted list.
15分Would a different tool make the original layer useful enough to change the answer, or is staffing now the bigger problem?
9分Tooling has priced an alternative for comparison, Luca, but even giving it the original layer count doesn't remove the split staffing on our actual release sequence, and that's where most of our hoped-for saving went
4分Then I wouldn't keep redesigning fingers to avoid saying the workload is wrong for this proposal. My split suggestion only helps if the split leaves a worthwhile job. Sounds like yours doesn't, at least with the orders you can actually schedule.
9分Can you shelve it without buying tooling?
11分Yes, we're still at proposal stage, and the team has decided not to buy this pallet cell; we'll keep the existing packing route and revisit only if the repeat workload changes, rather than budget for orders we wish arrived together
4分Fair enough. Useful to hear a no-buy result too, especially before a tool order makes everyone determined to continue.
8分Thanks for the paper walk-through, Luca, it gave dispatch something concrete to disagree with, and Theo's stable-order idea was worth testing even though our real release order ruled it out
21分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .