Include the exact message and the active step with an occurrence time. The picture of the stopped arm may not distinguish a wait from a fault.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Which event details are missing from my FR5 sleeve-unloading video?
NathanAli0199 · 2026年7月26日 03:11 UTC
16 条回复
The message is outside my video frame, so I have no message tied to that occurrence.
10分You can improve the ticket now with the installed versions and program identity. Ask support which logs they need, then give the shift a short capture request.
23分Also record what the sleeve and tray were doing before the stop. I would include recent changeovers as context, without calling them the cause. That helps whoever has to organise the next observation.
13分Keep evidence from separate occurrences separate; a convenient screenshot from another job will not supply the missing message.
12分Louis, agreed. The ticket can list the missing item explicitly... otherwise somebody tries to make the attachments look complete and creates a worse puzzle.
14分Support has specified an export and I have added the program and fixture references; the next occurrence still needs capturing under our normal procedure.
5分Record the screen and physical state against that same time. I cannot infer whether the sleeve was released just from the active step name.
13分Would it help to agree who collects the records after the shift? Capturing them is only half the job if the person answering the supplier never receives them.
17分Yes. Name a collector and keep the originals. A compressed clip forwarded through three people can lose the one screen detail you needed.
14分Preserving originals is sensible, but do not imply compression is the established problem with Nathan's first recording.
22分Fair correction. Nathan said the message wasn't in frame at all. I meant that as a precaution for the next capture, not the explanation for this one.
20分We have now caught an occurrence with the message and matching log interval; I sent those together, and the displayed waiting step is identified but its underlying cause is not.
14分That is enough to make the follow-up more specific. Ask support what evidence they need to explain that wait. I would keep any production plan based on the current restriction until they have assessed it.
9分They have asked for the relevant fixture-status comparison, which our controls owner is preparing; no component diagnosis or corrective change has been agreed.
11分When that comparison is ready, keep command state distinct from confirmed physical state. Similar labels could otherwise make the explanation look more certain than it is.
20分