our fr10 advances the pocket before the block is down

ImranAli0218 · 2025年12月29日 21:23 UTC

已关闭
IM
ImranAli0218
Our FR10 saves the next source pocket while still holding the block. Restart trusts that number. I don't.

13 条回复

VI
VictorBrown0881

Did the block remain held in the interruption you observed, or are you describing a possible gap in the sequence?

7
IM
ImranAli0218

Observed. Block held, next pocket saved. The destination fixture was still empty.

16
WI
WillAllen0313

Our review needed planned source, confirmed pickup and confirmed placement kept apart. Ask controls to describe your held-block state explicitly, with unknown outcomes left for the agreed recovery decision rather than inferred from the next pocket.

21
DI
DineshBennett0734

Walk through the opposite gap too, where placement has happened but the saved record has not advanced, before changing when the counter is written

15
LE
LeoChan1058

Who will make the recovery decision on the shift? A better state model still needs a practical handover, especially when the physical observation is incomplete.

12
VI
VictorBrown0881

Imran, has the review included which source tray the saved pocket belongs to?

12
IM
ImranAli0218

Tray identity added, Victor. Leo, controls and the shift lead own the recovery design together.

17
WI
WillAllen0313

Include reopening after the review decision has been saved. Otherwise the first careful recovery can be undone by the next application restart, even if the interrupted case looked right in the initial check.

14
IM
ImranAli0218

Both interruption gaps and post-review reopening are in the offline tests. No automatic repeat for uncertain outcomes.

8
LE
LeoChan1058

Did the shift lead understand the proposed screen without your explanation? I would be interested in which state was hardest to distinguish.

4
VI
VictorBrown0881

And do the tests include a late result for the original attempt? That should not silently become confirmation for whatever is next.

20
IM
ImranAli0218

Late result keeps its original identity. Screen read-through exposed confusion between planned and confirmed placement; wording still being revised.

6
DI
DineshBennett0734

Keep the confused example in the handover check, with the operational recovery still subject to the owners' review

9