Did the block remain held in the interruption you observed, or are you describing a possible gap in the sequence?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
our fr10 advances the pocket before the block is down
ImranAli0218 · 2025年12月29日 21:23 UTC
13 条回复
Observed. Block held, next pocket saved. The destination fixture was still empty.
16分Our review needed planned source, confirmed pickup and confirmed placement kept apart. Ask controls to describe your held-block state explicitly, with unknown outcomes left for the agreed recovery decision rather than inferred from the next pocket.
21分Walk through the opposite gap too, where placement has happened but the saved record has not advanced, before changing when the counter is written
15分Who will make the recovery decision on the shift? A better state model still needs a practical handover, especially when the physical observation is incomplete.
12分Imran, has the review included which source tray the saved pocket belongs to?
12分Tray identity added, Victor. Leo, controls and the shift lead own the recovery design together.
17分Include reopening after the review decision has been saved. Otherwise the first careful recovery can be undone by the next application restart, even if the interrupted case looked right in the initial check.
14分Both interruption gaps and post-review reopening are in the offline tests. No automatic repeat for uncertain outcomes.
8分Did the shift lead understand the proposed screen without your explanation? I would be interested in which state was hardest to distinguish.
4分And do the tests include a late result for the original attempt? That should not silently become confirmation for whatever is next.
20分Late result keeps its original identity. Screen read-through exposed confusion between planned and confirmed placement; wording still being revised.
6分Keep the confused example in the handover check, with the operational recovery still subject to the owners' review
9分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .