Old bracket notes show restrained alignment, released failure and unexplained correction. I want actual measurement supports and fit-up evidence separated before the FR5 plan borrows the final pass.
Start by pairing each measurement with its bracket, drawing reference and recorded condition. Keep the incoming fit-up evidence beside that, not inside a general aligned tick. Where the correction or support is missing, name the gap before anyone estimates what the new fixture will achieve.