I am reviewing a UR5e bracket-welding proposal against old inspection sheets. The fixture check records contact at the stops; the bench check records dimensions after release and occasional correction. Can I use separate acceptance stages in the new documentation so the operator does not mistake a seated assembly for an acceptable finished weldment?
Can I separate the fixture check from final bracket acceptance?
LiamBrooks0838 · 2025年5月1日 00:57 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .