Can I separate the fixture check from final bracket acceptance?

LiamBrooks0838 · 2025年5月1日 00:57 UTC

已关闭
LI
LiamBrooks0838
I am reviewing a UR5e bracket-welding proposal against old inspection sheets. The fixture check records contact at the stops; the bench check records dimensions after release and occasional correction. Can I use separate acceptance stages in the new documentation so the operator does not mistake a seated assembly for an acceptable finished weldment?