I am reviewing a UR5e bracket-welding proposal against old inspection sheets. The fixture check records contact at the stops; the bench check records dimensions after release and occasional correction. Can I use separate acceptance stages in the new documentation so the operator does not mistake a seated assembly for an acceptable finished weldment?
Can I separate the fixture check from final bracket acceptance?