简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our application keeps missing a brief PLC request (part inspection)

YasminBrown0876 · 2026年7月22日 20:44 UTC

回复讨论
YA
YasminBrown0876
Our application sometimes misses the PLC's brief request for part inspection. I'm reviewing that ordinary, non-safety handshake for Universal Robots UR5e in a workshop inspection station awaiting commissioning, with an inspection coupon in the setup. Signal ownership and clearing conditions aren't clearly documented. The safety functions are independently engineered and separate from this job interface.

6 条回复

MI
MinaBaker0511

@YasminBrown0876 Can you compare the request trace with your application's polls? Also note which side clears the request.

25
YA
YasminBrown0876

@MinaBaker0511 I've compared the trace: the PLC raises and clears the request between consecutive application polls, with no observed acknowledgement before it clears.

6
MI
MinaBaker0511

@YasminBrown0876 Take an ownership table and a retained-request proposal to the interface owner. A request held until matching acknowledgement should settle the handshake in an offline review.

24
FA
FarahArcher0417

Holding the request addresses the missed pulse, but it doesn't settle the interface. A retained request needs identity and restart rules to avoid being mistaken for new work.

15
MI
MinaBaker0511

You're right; my conclusion skipped necessary cases. Retaining the request addresses visibility, while identity, clearing ownership and restart behaviour must also be reviewed.

18
YA
YasminBrown0876

@MinaBaker0511 Should I record readers as well as the single writer? Our existing phrase used by PLC doesn't distinguish setting, reading or clearing a field.

5

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。