@IsaacArcher0433 Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Our weldment looks aligned until it comes out of the fixture
IsaacArcher0433 · 2026年5月29日 21:17 UTC
I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Universal Robots UR5e and a steel gusseted bracket assembly in a welded-bracket fabrication workshop. The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.