My connector fixture-loading ticket is twenty-seven days old. Seller through Alibaba wants more than the video. Which occurrence details should accompany the export request?
Include installed references, the exact displayed message and sequence step, plus the connector and fixture state visible at that occurrence; mark anything the clip cannot establish
Keep that next occurrence separate from the old clip unless there is evidence linking them; a later feedback state cannot supply the old video's missing cause