JackBrown0950
I watched the panel-tool demo again and the first useful action is a person lifting one sheet off the stack for it. The UR5e then takes that sheet to the nest. Our quote describes taking panels from the stack, and the vacuum report only covers the seal on the separated panel. I'm not saying the tool can't do it. I just don't want the hand-separating job to quietly become our operator's problem after we've bought it. What should the supplier demonstrate or explain before we choose this arrangement?

16 条回复

NI
NinaBrown0936

I've been asking the same question about another panel trial: if the samples arrive already separated, the interesting part has happened before the demonstration starts. Take a representative received stack to the review and ask for the whole proposed route to the nest. Include how one panel is established, how it's supported and what happens when the system cannot establish that. The seal result can stay in the pack. It just leaves plenty unanswered.

25
JA
JackBrown0950

We have an unopened stack from the intended supply. Supplier knew that was the starting point. I'm asking them to mark the hand separation explicitly on the demo sequence instead of calling the whole thing automatic.

9
HE
HenryBaker0438

Does the proposal expect a person to prepare each panel, Jack, or was that only how they staged the demonstration?

8
EM
EmmaBrooks0811

I'd want that answer before treating the person as hidden operating labour. The demonstration may be incomplete without the proposed process actually needing someone there every cycle.

-1
JA
JackBrown0950

Fair point, Emma. Quote says from the stack, but doesn't describe separation. I don't know whether they've designed it or just left it for later.

14
LU
LucaBarnes0526

Ask them to include the condition of the panel when it reaches the nest as well, since a successful single-panel pickup would not tell you whether the unsupported portion bends or catches during placement

8
NI
NinaBrown0936

And don't substitute a row of loose panels for your unopened stack at the review. You can inspect the incoming condition, obviously, but keep the actual preparation work visible if someone starts doing it.

7
HE
HenryBaker0438

What holds up the free edge while the panel goes into the nest?

5
JA
JackBrown0950

Nothing shown, Henry. The drawing has the tool centre moving to a dot. Luca's point is awkwardly relevant: the panel outline disappears from that part of the sketch.

20
EM
EmmaBrooks0811

Then send them the panel outline on that question. Otherwise they may answer tool clearance and still never show what the sheet does beside it.

9
LU
LucaBarnes0526

Does the nest designer know which panel orientation the tool supplier intends, Jack? I would get those two looking at the same view rather than sending separate questions about each end

22
JA
JackBrown0950

They've now agreed to review together, using the same received stack and proposed orientation. No revised tool offered yet. Separation and support are both still questions, not findings from another trial.

5
NI
NinaBrown0936

Who decides whether an uncertain pickup is held for attention, and how will the operator know what needs checking? I'd put that in the joint discussion. A sensor description on its own won't explain the job when it cannot give a reliable answer.

24
HE
HenryBaker0438

Did the supplier explain separation at the review, Jack?

14
JA
JackBrown0950

Review hasn't happened yet. They're still preparing the proposal. I've added Nina's uncertain-pickup question, and our unopened stack is staying available for the agreed comparison.

7
EM
EmmaBrooks0811

Useful to know it's still a proposal. I'd keep the original demo described as transfer of a hand-separated panel, so nobody reading the quote later mistakes it for the missing stack trial.