we priced the arm and apparently forgot the job
HenryBarnes0525 · 2025年1月25日 15:01 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
13 条回复
One product and one tray format, with preparation time counted from the start.
10分We have one mounting block that runs most weeks. I can limit the pilot to that, but it arrives loose in a box. Presentation is probably the expensive unknown
9分Measure that manual preparation first; a robot purchase isn't needed to expose its labour cost.
17分I've booked time with the operator to map unpacking through finished trays. We're not counting only the pick-and-place section this time
23分Also ask what makes them reject a block, or your neat pilot may depend on somebody silently sorting the awkward pieces out first.
13分Include rejects in the observation sheet, with the reason and handling time.
15分Our class once timed the easy tray ten times and called it representative, then discovered the person supplying those trays was doing all the hard work off camera.
7分Agree the sample with your colleague before timing, including the awkward routine cases.
6分She picked the sample with the operator. It includes normal tangled arrivals and a tray change. We've agreed to report assistance separately instead of hiding it in a cycle average
10分Cannot judge the saving without a baseline. Time the current method on comparable work as well, and note interruptions rather than quietly deleting them.
4分And cap the pilot effort; agree when enough evidence means pause, revise or continue.
15分We agreed an effort cap at the planning meeting. No arm order from this exercise; the next decision is whether presentation is worth a paid tooling trial
18分Who records the internal hours, so the tooling decision includes the work you're already committing?