we priced the arm and apparently forgot the job

HenryBarnes0525 · 2025年1月25日 15:01 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HE
HenryBarnes0525
My FR10 tray-loading estimate missed fixture design and our own staff time. My colleague is fed up with the moving total. How small can we make a pilot that actually tests those costs?

13 条回复

SA
SamCarter1029

One product and one tray format, with preparation time counted from the start.

10分
HE
HenryBarnes0525

We have one mounting block that runs most weeks. I can limit the pilot to that, but it arrives loose in a box. Presentation is probably the expensive unknown

9分
SA
SamCarter1029

Measure that manual preparation first; a robot purchase isn't needed to expose its labour cost.

17分
HE
HenryBarnes0525

I've booked time with the operator to map unpacking through finished trays. We're not counting only the pick-and-place section this time

23分
OM
OmarBrooks0839

Also ask what makes them reject a block, or your neat pilot may depend on somebody silently sorting the awkward pieces out first.

13分
SA
SamCarter1029

Include rejects in the observation sheet, with the reason and handling time.

15分
IM
ImranChan1088

Our class once timed the easy tray ten times and called it representative, then discovered the person supplying those trays was doing all the hard work off camera.

7分
SA
SamCarter1029

Agree the sample with your colleague before timing, including the awkward routine cases.

6分
HE
HenryBarnes0525

She picked the sample with the operator. It includes normal tangled arrivals and a tray change. We've agreed to report assistance separately instead of hiding it in a cycle average

10分
HA
HazelAdams0136

Cannot judge the saving without a baseline. Time the current method on comparable work as well, and note interruptions rather than quietly deleting them.

4分
SA
SamCarter1029

And cap the pilot effort; agree when enough evidence means pause, revise or continue.

15分
HE
HenryBarnes0525

We agreed an effort cap at the planning meeting. No arm order from this exercise; the next decision is whether presentation is worth a paid tooling trial

18分
SA
SamCarter1029

Who records the internal hours, so the tooling decision includes the work you're already committing?

7分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .