简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Cannot rank the FR5 trial against a different tray

CalebAli0232 · 2025年11月14日 18:29 UTC

已关闭
CA
CalebAli0232
Our bearing sleeves ran in a purpose-made tray for one demonstration and our existing workshop tray for another. I can compare the videos. I cannot fairly compare the handling systems from them.

15 条回复

HA
HassanBaker0443

Who filled the purpose-made tray, and how long did it take?

13
CA
CalebAli0232

The demonstrator filled it before filming. No time given. Our workshop tray arrives already filled from the preceding operation.

15
JA
JackAli0254

Does the proposed process replace that workshop tray upstream, or add a transfer into the new one? Those are different jobs to price.

18
LI
LinArcher0357

I wouldn't dismiss the better tray. It might be the useful thing in the demonstration. I'd try loading one by hand with your actual sleeves before asking for another robot video.

13
CA
CalebAli0232

Jack, the supplier assumed we would transfer into their tray. That operation is missing from their time. Lin, we can borrow a sample tray to examine that step.

1
VI
VictorBrooks0794

Borrow it with the loading instructions. Not everybody gets the demonstrator standing beside them.

19
HA
HassanBaker0443

And use whoever would actually fill it, Caleb. Your best setter hovering over it won't represent a busy shift.

14
JA
JackAli0254

Lin, would you compare the tray on its own before trying to standardise both robot trials? I'm unsure how much a manual fill can settle.

-7
LI
LinArcher0357

I'd use it to find obvious extra work, not declare a winner. The sleeves may be easy to orient, or they may need turning individually. Either answer changes what the later trial has to include.

15
VI
VictorBrooks0794

And don't lose sight of who empties the old tray afterwards.

8
CA
CalebAli0232

The sample tray reached us. Our operator says each sleeve needs turning to expose its locating feature, whereas the present process accepts either orientation. We have not timed the full task yet.

14
HA
HassanBaker0443

That is a new operation, not just a nicer tray.

14
JA
JackAli0254

Can the preceding operation supply that orientation without adding work elsewhere? Worth asking before you price a permanent manual transfer.

16
CA
CalebAli0232

The upstream lead is checking. I've kept the new-tray option, but removed the claimed cycle advantage from my comparison until preparation and empty-tray handling are included.

16
LI
LinArcher0357

That's a fair shortlist position. Better tray, unresolved process cost. I'd still be interested in whether the upstream change turns out easier than the extra transfer.

25

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .