Which bracket dimension was checked before the straightening note?

NoraChan1105 · 2025年9月28日 21:40 UTC

已关闭
NO
NoraChan1105
Found an old bracket sample tagged pass, then discovered it had been straightened before inspection. We're reviewing fixtures for an FR5 welding proposal. How do I find out what that jig actually achieved?

20 条回复

AA
AaronBarnes0523

Look for an identified measurement after release but before straightening. The accepted sample can show the required final condition, but it cannot show the untreated result on its own.

4
NO
NoraChan1105

There is an angle reading on the route card, but no indication whether the bracket was clamped. The sample tag only has the final inspection number.

12
AA
AaronBarnes0523

Can inspection connect that route card to the tagged sample? I would establish that before trying to explain the angle reading.

3
WI
WillAllen0313

I had a batch folder where the route card was for the first piece and the retained sample was from the end of the run. Both were valid records, just not a before-and-after pair. Ask whoever kept these how the sample was selected.

3
NO
NoraChan1105

Inspection says the tag identifies the batch, not a particular bracket. So no, Aaron, we can't connect those two. Will, that's a useful warning about the retained sample.

16
WI
WillAllen0313

Keep the distinction in your review. You can still use the sample to discuss the finish and final geometry without turning it into evidence of how much this jig distorted a bracket.

12
NO
NoraChan1105

I've separated them. The fabrication lead is looking for the old setup instruction, particularly what press gusset down meant before clamping.

21
BR
BrunoChan1061

Ask how long that fit-up work took as well, because the new cell estimate can lose quite a lot between those three words.

18
OS
OscarBaker0445

Was the gusset the same revision as the proposed part?

15
AA
AaronBarnes0523

That revision check matters for the fixture too. A locating face added for an earlier gusset may have a different purpose with the current component.

7
NO
NoraChan1105

Old gusset is revision B; proposed assembly uses D. B had an extended lower edge that D removes. The fixture sketch in the folder still shows a contact beneath that old edge.

13
WI
WillAllen0313

Give the designer both component drawings and that contact sketch. Let them establish the intended locators for D. Adding another clamp to an old picture could make an obsolete contact more effective at doing the wrong thing.

22
NO
NoraChan1105

Sent both. They are reviewing the current contacts before quoting the fixture. We still haven't found a released reading from before straightening, so the old correction amount is unknown.

8
AA
AaronBarnes0523

Will the new trial include fit-up and untouched released readings on the same identified pieces? That would answer more than another measurement of the retained sample.

19
NO
NoraChan1105

Yes. Inspection and the welding specialist are planning those stages together. They also want to assess the incoming gussets rather than assume all the gap came from the fixture.

11
BR
BrunoChan1061

And keep correction labour in the estimate until that trial tells you whether it is still needed.

15
OS
OscarBaker0445

Did removing that old contact change the proposal much?

5
NO
NoraChan1105

Oscar, it hasn't been removed yet. The designer is proposing a revised locating arrangement for D, but the review is unfinished. I don't have a cost comparison to share.

16
NO
NoraChan1105

The revised fixture concept is back with a current-part sample plan. The old contact is omitted in the proposal, not altered on the existing jig. Thanks all; we now have a defined trial to price instead of copying the straightening note.

10
AA
AaronBarnes0523

Please return with the released measurements when the trial happens. I would be interested whether the incoming fit-up check changes the explanation as well.

21

讨论已关闭