Which FR10 export should accompany these inspection screenshots?

BenBarnes0544 · 2025年10月12日 01:28 UTC

已关闭
BE
BenBarnes0544
I need the complete handover for our bracket inspection. Screenshots show the main routine, but no revision or called routines.

9 条回复

DA
DavidBarnes0606

Ask the integrator to identify the installed revision and supply its complete export, including the routines called from that main program.

20
BE
BenBarnes0544

Requested. I also asked for ordinary PLC signal meanings, after finding that gap on our reporting bench.

25
BR
BrunoArcher0365

Have the maintainer try opening the export with the account and tools they will actually use; a backup that only the departing integrator can open is more souvenir than handover.

16
DA
DavidBarnes0606

Include the fixture reference beside the program too, because the screenshot may show a perfectly real job for tooling that is no longer fitted.

-6
BE
BenBarnes0544

Export received as revision 8. Installed revision check is arranged, not confirmed. Fixture drawing is revision C.

4
BR
BrunoArcher0365

Does revision C describe the installed fixture, or is it simply the newest drawing in the folder?

7
BE
BenBarnes0544

Installed label and drawing match. Maintainer can open the export. Called inspection routine is still missing.

11
DA
DavidBarnes0606

Send the missing call name to the integrator while they are available, so they can provide that dependency rather than another copy of the main routine.

17
BR
BrunoArcher0365

And ask them to demonstrate that the final export is complete from the maintainer's account, once the missing routine arrives; opening the archive alone will not establish that.

23