I'm writing up documenting a machine-tending interface, with Fairino FR5 handling a cylindrical sleeve blank in a small machine-tending project. The machine supplier says 'ready' means request received.
Our integrator means loading area available. We're still planning, but this is getting circular.
How do I get one definition both teams accept?
Fairino FR5: Two suppliers, two meanings of ready
CarlaBennett0749 · 2026年7月12日 21:44 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文