简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

My fixture-check completion reporting tracker mixes up consecutive attempts

SamAbbott0072 · 2026年8月11日 16:24 UTC

回复讨论
SA
SamAbbott0072
In our offline test, delivering an old completion after a new attempt starts makes the new fixture-check completion reporting attempt look complete. The real setup uses Fairino FR10 in a bench cell preparing for commissioning, with a reference housing as a reference. I'm trying to exercise delayed and duplicate events reliably; random sleeps keep making the test hard to reproduce.

2 条回复

HE
HenryBrown0873

@SamAbbott0072 Can you preserve that failing delivery sequence and check which identifier the handler uses to match completion: the specific attempt or only the job label?

6
SA
SamAbbott0072

Just the job label. I've saved the sequence: earlier completion arrives after the new attempt starts. It reproduces the wrong match.

8

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。