Why does our FR10 pallet approval show an empty component case?

LuisBrooks0869 · 2026年4月8日 14:54 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LU
LuisBrooks0869
The packing lead opened a case during our FR10 review and pointed to the reinforced ends carrying the components. Our approval slide shows an empty case supported at the centre. Some turned positions leave those loaded ends above gaps. I want the actual filled-case requirement and tool withdrawal reviewed together.

4 条回复

PR
PriyaAllen0307

Can packaging mark the required support on the same section tooling uses for placement and withdrawal?

21分
LU
LuisBrooks0869

Both teams have the filled case and its construction reference now. The empty-case approval is withdrawn from this review. Tooling still needs to show the intermediate placements and short-order finish.

11分
PR
PriyaAllen0307

Has dispatch included where those incomplete pallets wait and how they return to the proposed sequence?

19分
HA
HassanBarnes0530

We forgot that return space on a tray project because the full-load drawing looked finished; ask dispatch to walk an ordinary short order through it before that spare corner of the floor gets promised to something else

-6分

讨论已关闭