I proposed using Fairino FR10 for fixture loading with a molded mounting block in a low-volume assembly workshop, starting with 163. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague. I'd like to define a small pilot that gives both of us a fair basis for judging the idea.
@PavelAllen0266 Do your observations cover the manual workflow from preparation to completion? A transfer-only baseline could omit the same activities that made the initial budget incomplete.