简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Starting with 163: what belongs in the pilot budget? (fixture loading)

PavelAllen0266 · 2026年7月11日 09:25 UTC

回复讨论
PA
PavelAllen0266
I proposed using Fairino FR10 for fixture loading with a molded mounting block in a low-volume assembly workshop, starting with 163. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague. I'd like to define a small pilot that gives both of us a fair basis for judging the idea.

2 条回复

LE
LeahBarnes0582

@PavelAllen0266 Do your observations cover the manual workflow from preparation to completion? A transfer-only baseline could omit the same activities that made the initial budget incomplete.

18
PA
PavelAllen0266

The observed batch required more workpiece preparation time than transfer time. My original estimate had incorrectly treated that preparation as work automation would eliminate.

19

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。