i'm preparing our part inspection handover for Fairino FR5 in a training inspection station preparing a handover, using a fixture-mounted coupon.
The notes are mostly pendant screenshots without revision details.
They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. i need a usable structure while the original integrator is still available
@HanaBaker0448 Start by identifying the installed program revision and its corresponding controlled export. Can you establish that link before describing the routine's dependencies?