Two meanings of ready in our UR5e sleeve handover

OwenChan1095 · 2025年12月18日 02:38 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

OW
OwenChan1095
Our lathe supplier says ready acknowledges the request. The UR5e integrator uses ready to mean the loading area can be entered. I've put both definitions in the same planning document and somehow both teams still say the interface is agreed. I need them to answer the same ordinary sequence before we write the operator page.

12 条回复

HA
HassanChan1052

Can the request be acknowledged while the loading area is still unavailable? I'd ask both teams that exact question.

21分
OW
OwenChan1095

The lathe supplier says yes. The integrator says it would wait for other machine states, but those states aren't listed in its interface page.

11分
JA
JaneBaker0510

Then the page is missing the permission conditions, not merely a better word.

16分
AM
AmaraBrooks0861

Who supplies those other states and defines when they are valid? The two teams need that agreed before the integrator can describe the loading permission meaningfully.

9分
CH
ChenBarnes0529

We had two owners defend the same word because each was thinking about a different end of the exchange. A paper walk-through of received-but-unavailable got a better answer than another edited glossary.

17分
OW
OwenChan1095

Amara, the lathe supplier supplies the ordinary states and the integrator combines them. Both are now listing the conditions together, with the received-but-unavailable example on the review.

11分
HA
HassanChan1052

Has the safety-related permission assessment been distinguished from that ordinary acknowledgement as well? I don't know your cell design, but the same casual ready label shouldn't blur that boundary.

20分
OW
OwenChan1095

Yes, the integrator owns that assessment separately and has marked the distinction in the review. The ordinary sequence is still a draft, not tested behaviour.

16分
AM
AmaraBrooks0861

Did the joint walk-through settle what the operator sees while the request is acknowledged but loading remains unavailable?

8分
OW
OwenChan1095

It produced separate proposed messages for request received and waiting for loading permission. The operator asked who gets called if it stays waiting; that ownership is not agreed yet.

0分
CH
ChenBarnes0529

Keep that question beside the draft, Owen. It's exactly the sort of thing that gets dropped when the two suppliers finally agree their own signals and declare the human part obvious.

21分
JA
JaneBaker0510

And what happens if either side restarts while waiting?

15分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .