The bracket passes with clamps on, then visits a mystery bench

HarishChen1185 · 2025年5月25日 03:44 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HarishChen1185
I'm helping review records for a UR5e bracket job. Clamped inspection says okay. Released inspection says wrong. Next line says corrected at bench. No description of that bench, no before-and-after readings. Someone has put the robot's repeatability in the new proposal as if that settles the whole thing. I don't see how. Where should we start looking for what the old process actually did?

5 条回复

OM
OmarChen1187

Ask the welding lead and final inspector about that bench operation first. The notes don't tell you whether it corrected fit-up, distortion or something else.

5分
HA
HarishChen1185

Final inspector remembers a separate checking fixture. Welding lead is looking for its drawing. We may have been calling a check a correction in part of the paperwork.

14分
OM
OmarChen1187

Then get the words explained before copying the step. I mean ask what the operator did there, including whether anyone physically changed the bracket.

21分
HA
HarishChen1185

Exactly. I've listed that question and asked for the part IDs on the old measurement sheets. No point comparing two numbers if they weren't even the same bracket.

8分
OM
OmarChen1187

Could the inspector recognise the bench from old photographs? Might be quicker than waiting for a drawing nobody knows how to find.

9分

讨论已关闭