简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The FR5 bracket request vanishes before our application wakes up

RachelAli0261 · 2026年4月22日 23:30 UTC

回复讨论
RA
RachelAli0261
The PLC trace shows a request but the bracket application has no received job. I can capture both now; what I can't find is who decided the request should clear on a timer. This is the ordinary inspection interface, and commissioning is waiting on it.

2 条回复

NA
NadiaBrown0900

What does the person at the station see when that happens? I cannot write a useful response to a missed request if the screen makes it look like the bracket was inspected.

7
RA
RachelAli0261

It keeps the previous bracket's green result. That's worse than I thought. I've given both authors the matched capture and asked them to agree receipt, result identity and clearing; the training page is waiting for that too.

6

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。