Our combined UR5e layer drawing names the current case but shows support for the old internal insert. Packaging has both filled samples. Who should settle the transition before we price new fingers?
Have packaging identify which construction each order will actually use, then ask tooling to compare access against those specific support needs. If both remain in use, the changeover and identification work belong in the price too.
Both remain in stock. Same outside label, different internal supports. Packaging wants separate construction references before approving either turned-row section.
Our filled carton exposed a support conflict that the outside outline hid too. I would put both actual samples in the joint review, especially if someone is tempted to reuse the first section with a new label.
Who identifies the construction when a partly used case batch returns to packing? A supplier list may be clear while the returned stock still looks identical.
Amara, did packaging and tooling settle either construction? I would be wary of treating a proposed stock separation as an implemented changeover just because the drawings have different names now.
Sarah's returned-stock question is awkward in a useful way. I'd ask the packer to identify an actual return, not only a new box beside its delivery label.