Which bracket checks should support our UR5e fixture proposal?

JamieBarnes0556 · 2025年12月31日 18:24 UTC

已关闭
JA
JamieBarnes0556
Our old angle-bracket cards combine a restrained alignment tick, released failure and acceptance after correction; I want the UR5e fixture proposal to use each for what it actually records, rather than turn the final pass into evidence that no correction was needed.

12 条回复

LI
LiamBell0664

Are all three entries linked to the same bracket?

4
JA
JamieBarnes0556

Yes, same individual tag; the released measurement is before correction, but the restrained tick has no method recorded.

20
LI
LiamBennett0751

Keep the tick as an unexplained setup observation until its method is established; it cannot supply a measured before-and-after change simply because it sits above the released result.

11
AD
AdaAdams0129

Does the released measurement identify its supports and drawing revision, Jamie? You may have a usable released failure even if the earlier observation cannot be reconstructed, but its acceptance basis still needs to be clear.

2
JA
JamieBarnes0556

Revision H is stated and the inspection instruction identifies the supports; I have both attached, so the released failure is usable on that basis.

0
AM
AmaraBell0687

What does the correction entry actually say?

24
JA
JamieBarnes0556

Straightening at the separate bench, operator initials, no duration; final acceptance uses the same inspection instruction as the released failure.

5
LI
LiamBell0664

Who does that work in the proposed route?

6
LI
LiamBennett0751

And keep its labour unresolved if unmeasured; the current proposal cannot make that separate bench disappear by leaving the allowance empty.

2
AD
AdaAdams0129

I would ask fabrication and inspection to agree one current traveller that follows an identified bracket from incoming fit-up through released inspection, any reviewed correction and final disposition. That is not much paperwork if it is designed around the actual handoffs. The important part is deciding who fills each section before the work starts. Otherwise the same gap survives in a cleaner form: everybody completes their own operation and assumes the next person recorded what happened between them.

1
JA
JamieBarnes0556

Current correction responsibility is not agreed yet, LiamBell; fabrication and inspection will review the traveller and that ownership together, with the estimate showing an unresolved operation rather than zero time.

21
AM
AmaraBell0687

Please post what they decide. That missing owner matters as much as the missing duration.

7