Why must my fixture absorb the FR5 mounting-plate substitution?

AnnaBell0677 · 2026年4月3日 02:57 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AN
AnnaBell0677
Our delivered FR5 mounting plate has a different locating shoulder from the fixture drawing the seller accepted. Different suffix too. Ten days of being told it is equivalent, while my housing tooling remains on the shelf.

18 条回复

CA
CalebAllen0319

Can your fixture designer compare the shoulder without fitting the tooling?

14分
AN
AnnaBell0677

Yes. She has both drawings, but the seller has not identified the supplied plate drawing.

14分
DA
DanielChan1087

Then equivalent is a sales answer with the useful page missing. Ask for the supplied drawing and have your designer mark the conflict. Don't pay her to redesign around a photograph.

14分
ZA
ZaraBrown0917

I would also ask for the originally agreed plate. Their substitute needn't become your design project.

7分
RO
RosaCarter0988

ZaraBrown, I agree about asking, though the supplied plate may turn out to suit after a proper comparison. Anna needs to know whether the locating shoulder changes the seated position, and whether the complete tool assembly still matches what her integrator assessed.

14分
DI
DineshAdams0125

Could Anna send one marked comparison with the original acceptance attached, so the seller has a specific mismatch to answer rather than another general request for clarification?

13分
HA
HazelBrown0919

Yes, Dinesh. Put the supplied reference in the subject once they identify it. Otherwise each reply seems to acquire a fresh plate (we had that happen with a camera bracket).

4分
VI
VictorBrooks0794

Who updates the spare list if you keep this one?

16分
AN
AnnaBaker0503

I would not change the spare list yet. Keep the delivered reference marked as unaccepted stock. Otherwise someone can reorder it while this discussion is still going on.

9分
SA
SamBell0681

Victor, that happened in our stores with an unconfirmed adapter. It was entered as the new version and the next request copied it. AnnaBaker's separate stock status would have saved us a second argument.

20分
AN
AnnaBell0677

Supplied drawing received. Our designer found that the shoulder prevents our tooling seating. I have requested the agreed plate, with her marked section attached. Thank you, Dinesh; that single comparison finally got an answer.

4分
ZA
ZaraChan1091

Does the reply actually offer that plate, Anna? I would keep the existing tooling arrangement as the starting point unless your integration team chooses a change. A new adapter could bring another set of dimensions into this.

14分
AN
AnnaBell0677

They offered a spacer first. I declined it. They now offer the agreed plate and collection of the substitute, with no extra charge in their written proposal.

18分
DA
DanielChan1087

Good. A spacer isn't automatically a harmless concession. Your designer shouldn't have to carry a new tool offset and fixing arrangement just to make their substitution disappear.

15分
ZA
ZaraBaker0482

Ask them to identify the plate they intend to send before it leaves, and let your receiving and integration people know what must be checked on arrival. You have already lost enough time to two things being called the same.

13分
ZA
ZaraBrown0917

Has collection been booked, or only offered?

13分
AN
AnnaBell0677

Replacement received and checked against the agreed drawing. The designer confirmed the shoulder and seating face match. The original plate has been collected. Our integrator still has the installation work; the supply mismatch is finished.

6分
VI
VictorBrooks0794

And stores gets the right reference at last.

10分

讨论已关闭