I filmed the connector job after closing the message. Seller on Alibaba needs more. What should I capture together?
The full message, active sequence step and occurrence time, linked to the matching log, with the actual connector and fixture state described. Ask maintenance which ordinary input the step expects before the report starts calling a particular component faulty.