The machine supplier's ready arrow means it received our sleeve-blank request. Our integrator reads the same arrow as loading area available. I've drawn a simple case where receipt happens while the previous sleeve is still there; can both teams walk that on paper before I put this description into the operator handover?
Our FR5 interface drawing turns receipt into permission to load
JackBell0689 · 2026年2月28日 23:05 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .