The machine supplier's ready arrow means it received our sleeve-blank request. Our integrator reads the same arrow as loading area available. I've drawn a simple case where receipt happens while the previous sleeve is still there; can both teams walk that on paper before I put this description into the operator handover?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Our FR5 interface drawing turns receipt into permission to load
JackBell0689 · 2026年2月28日 23:05 UTC
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .