The machine supplier's ready arrow means it received our sleeve-blank request. Our integrator reads the same arrow as loading area available. I've drawn a simple case where receipt happens while the previous sleeve is still there; can both teams walk that on paper before I put this description into the operator handover?
Our FR5 interface drawing turns receipt into permission to load
JackBell0689 · 28 Feb 2026, 23:05 UTC
0 replies
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .