Every bag variant adds another fixture to our shared bench

IsaacAbbott0085 · 2026年6月9日 11:10 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

IS
IsaacAbbott0085
The FR10 moves our filled sample bags into trays. That part works. Starting quantity was 234, but each new bag shape needs more presentation work. I have spent a lot of effort on this and am reluctant to stop. The shared bench is gradually becoming my fixture store.

17 条回复

AL
AlexAbbott0037

Count the preparation time before funding another variant. You could have a working transfer and still have made packing more expensive.

14分
IS
IsaacAbbott0085

I timed transfer only. Operators straighten the bags and fill the guides before I start that timer. They have been fairly patient about this omission.

8分
NA
NathanAllen0286

Would one stable bag type earn its space though? You might be throwing away a useful narrow job because the proposal keeps collecting every product people mention.

17分
IS
IsaacAbbott0085

There is one repeat bag size. It also runs in small mixed orders. Keeping its guides installed would block the rest of the packing work.

17分
DI
DineshBrooks0821

I would include removing and storing those guides in the comparison. Actually, include retrieving the right set as well. Maintenance gets called when several nearly identical pieces have been put in one drawer.

11分
JA
JaneAllen0336

Ask the operators what they would do with the bench if this stopped. That gives the space a practical value instead of treating it as free floor area.

22分
IS
IsaacAbbott0085

They want the bench back for mixed orders. I already had that answer, I just kept thinking another guide would make the complaint go away.

14分
AL
AlexAbbott0037

Then show them the full comparison. They are allowed to prefer the old job without becoming the obstacle to your project.

20分
NA
NathanAllen0286

Alex, I agree they should be heard, but there is still a question about that repeat size. Could it run elsewhere, if there is spare space?

12分
AL
AlexAbbott0037

If there is a real spare station, price it. I wouldn't count imagined space as the rescue plan.

5分
IS
IsaacAbbott0085

Nathan, we have no other suitable bench allocated. Alex, I am including manual packing beside the full preparation and changeover time. No new guides commissioned while we compare.

19分
DI
DineshBrooks0821

Would somebody other than you maintain the guides? If the answer is no, the estimate also needs the support you currently provide whenever a bag sits badly.

18分
IS
IsaacAbbott0085

No named replacement for me. I have been treating my support as incidental. The existing notes show it recurring across the variants.

19分
JA
JaneAllen0336

That is enough to put a stop decision in front of whoever funds it. You do not owe the earlier effort another purchase.

21分
IS
IsaacAbbott0085

We agreed to end this packing trial and return the bench to mixed orders. The robot will stay available for separately approved trials. Keeping the timing notes and guide drawings, including the inconvenient bits.

18分
NA
NathanAllen0286

Fair decision with no spare station and no support cover. I still think a stable product could suit that motion, but it doesn't have to be this packing job.

11分
DI
DineshBrooks0821

Record the guide inventory before it leaves the bench. Somebody can reuse the design work later without mistaking the stored tooling for an approved production process.

22分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。