简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Cannot choose the FR5 base position from this sketch

HazelAdams0136 · 2025年5月8日 00:08 UTC

已关闭
HA
HazelAdams0136
Our FR5 loading sketch reaches the polymer blank fixture. Complete gripper and open door missing. I need a base decision, but cannot approve this drawing. What should the access check contain?

21 条回复

AD
AdaArcher0390

Have they got your actual door arrangement, or just an outline of the mill? That's where I'd start before arguing about the base

11
HA
HazelAdams0136

Mill outline only. Door swings into space they have given the robot.

5
AD
AdaArcher0390

Then send them the door-open view first. Does it have a handle sticking into the opening as well?

14
HA
HazelAdams0136

Yes. Pull handle and a folded bracket behind it.

8
AD
AdaArcher0390

Photograph both, please. Designers seem very good at finding space where the awkward little fittings live

8
HA
HassanArcher0356

Include the loaded tool drawing and open jaws; loading uses both shapes.

15
AD
AdaArcher0390

Where do the hoses leave the gripper? Those can spoil an otherwise decent gap too

4
NA
NaomiBarnes0593

Your earlier mounting discussion had cable routing excluded. Is this proposal any clearer about who owns it?

1
HA
HazelAdams0136

Different proposal, same omission. Toolmaker supplies fittings. Integrator has not accepted the routing task yet.

17
CA
CallumBell0621

Get that responsibility settled before signing the layout, because a fitting model alone won't show how the hose moves through the opening

11
AD
AdaArcher0390

Who is collecting all this into one drawing? You shouldn't have to be the person mentally assembling five suppliers' emails

9
HA
HazelAdams0136

Integrator will own the combined layout and routing review. They've asked for the toolmaker's latest assembly.

15
AD
AdaArcher0390

Good, someone to ask when the bits disagree. Have they given you an approach route or still just one pose?

15
NA
NaomiBarnes0593

And check that the latest assembly means the one being supplied. Our purchasing revision once lagged behind the review drawing.

7
HA
HazelAdams0136

One pose so far. Toolmaker confirms the assembly revision matches the order. Route still pending.

4
HA
HassanArcher0356

Ask for withdrawal after release as well.

17
CA
CallumBell0621

That return needs the open-jaw shape Hassan mentioned. It could need more space than the held blank on the way in

18
AD
AdaArcher0390

Does the door stay in the same open position for both journeys?

7
HA
HazelAdams0136

Yes. Same door position throughout loading. Added both jaw states and withdrawal to the review request.

19
AD
AdaArcher0390

Let us know what the route check finds. I'd be interested whether moving the base helps or just shifts the awkward bit to the wrist

19

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .