简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

FR10 spacer report with two different meanings of fixture ready

RachelAllen0348 · 2026年4月26日 16:42 UTC

回复讨论
RA
RachelAllen0348
Support's FR10 reply calls our spacer fixture ready when the request is received. Our operator screen uses that label for the physical fixture indication. The seller has had the ticket for twenty-five days, and I think our latest video has made the ambiguity worse. I have the installed fixture and job references. I want one occurrence where the request, actual indication and waiting step can be distinguished.

12 条回复

YA
YasminBell0615

Can the application author name those separate fields before the next capture?

6
RA
RachelAllen0348

Author identified request received and fixture available separately in the trace. The summary export keeps only one ready column, using the request field.

4
TO
TobyChan1101

Does the raw record retain the fixture-available field for your existing stopped attempt? That could answer more than another video while the summary is being corrected.

24
RA
RachelAllen0348

It does. Request was received, but fixture available dropped before the wait. Maintainer is checking the mapped physical source for this installed fixture.

3
SO
SofiaBrooks0804

Keep that raw interval with its attempt identity. In another report, a shortened export lost the preceding change and everyone focused on the stopped pose. Your corrected summary should retain both fields too.

21
RA
RachelAllen0348

Maintainer found movement at the availability switch bracket. The fixture designer is arranging its restoration to the intended mounting; author has corrected the two summary labels.

-2
YA
YasminBell0615

Who checks the repaired fixture with the application afterwards?

21
RA
RachelAllen0348

Our maintainer and the application author, with the shift lead. They'll use the identified block and fixture from the captured occurrence, and compare the full sequence rather than just watch the switch.

25
TO
TobyChan1101

Does the operator's screen get the same separate names? The trace can be perfectly clear while the next shift still reports the old ambiguous ready.

5
SO
SofiaBrooks0804

Toby, yes, and the trainer should hear how the shift describes it. Replacing one vague word with two unfamiliar labels may still leave the phone report hard to follow.

7
RA
RachelAllen0348

Repair and normal loading comparison completed without the recorded drop recurring. Shift lead could identify request receipt and fixture availability on the revised screen. Interrupted-sequence checks remain with the author; thanks, Toby, the operator view had nearly stayed unchanged.

19
YA
YasminBell0615

Has the support ticket been updated with what is finished and what still needs checking?

14

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。