简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Which released bracket belongs to the old aligned-in-fixture note?

KaiChen1150 · 2026年8月15日 11:00 UTC

回复讨论
KA
KaiChen1150
I know an alignment note is not a numerical baseline. In the records for our FR10 bracket proposal, though, it still sits beside a released failure and an unexplained correction. How do I establish what those pages actually belong to before we choose locating and final inspection requirements? This is a records review only.

16 条回复

RE
RebeccaBennett0778

Follow identifiers before dimensions. Do the restrained note, failed inspection and correction record all name the same assembly?

14
RO
RosaCarter0988

And check the drawing and fixture revisions, not just the part name. My own bracket review has the same trap: a familiar description can make different inspection stages look like one continuous record.

17
AD
AdaArcher0390

Who put those pages together in the first place? They may know what the grouping meant

21
BE
BethBennett0759

Do not rely on the folder order as chronology. I have had inspection exports sorted by filename, then read as a process sequence. Preserve the original bundle while you establish the event order.

-1
KA
KaiChen1150

The bundle was prepared for the proposal, not kept as a traveller. The alignment page names a fixture trial. The released sheet names a production assembly. I'm checking whether those identities connect at all.

4
RE
RebeccaBennett0778

That is a significant gap. Do not calculate change between them while the link is unknown.

18
RO
RosaCarter0988

You can still use the released failure as evidence that an identified assembly missed its requirement, provided its method and drawing references are sound. It just may not describe the outcome of that fixture trial.

22
KA
KaiChen1150

Quality found the original index. They are different assemblies. The proposal author grouped them as examples, then the accompanying summary described them as before and after. I've asked for that summary to be corrected.

7
AD
AdaArcher0390

Does the correction record belong to the released failure, or is that another loose example?

23
KA
KaiChen1150

That pair does match. Same assembly, failed result, correction entry, accepted result. The operation itself is still unexplained. Incoming fit-up isn't recorded on either sheet.

18
BE
BethBennett0759

Then keep two findings visible: the false before-and-after link is repaired, while the corrected assembly still cannot establish uncorrected production capability. One tidy summary sentence could muddle them again.

17
RE
RebeccaBennett0778

Has the proposal author actually replaced the summary?

13
KA
KaiChen1150

Yes. Revised today, with the fixture observation separated from the production assembly's correction history. The comparison that started this thread is withdrawn.

6
RO
RosaCarter0988

For the remaining study, let quality specify final inspection conditions and fabrication describe preparation and restraint. That gives the new cell real requirements without pretending these unrelated historical pages supplied them.

22
KA
KaiChen1150

Those owners are assigned. No fixture choice until we have that basis. Thanks Rebecca; checking identities stopped us arguing about a dimensional change that the bundle never showed.

2
AD
AdaArcher0390

Worth keeping the withdrawn summary marked, so someone doesn't retrieve it and restart the same comparison

15

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。