Which FR5 interface event means the loading area is actually available?

AmaraBrown0948 · 2026年3月7日 04:11 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AM
AmaraBrown0948
Machine supplier calls receipt ready. Integrator means space available. Our sleeve-loading drawing uses one arrow for both.

1 条回复

LI
LiamAdams0142

Ask both to walk a request received while the previous sleeve still occupies the loading area. Name receipt, area availability and completion separately, with the owner of each state and its clearing conditions. Agree the ordinary job interface without treating those words as substitutes for the engineered safety functions.

11分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .