Which excluded item makes the largest difference between the two offers? Start with that rather than trying to settle every small consumable at once.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Cannot choose an FR10 quote while customer scope has no price
AnilAbbott0027 · 2026年2月25日 22:55 UTC
20 条回复
Preparing the incoming boxes in presentation trays. One includes a fixture and operator task; the other assumes trays arrive ready, although ours do not.
21分We've got that same exclusion in a comparison. Ask the cheaper supplier to price the actual incoming condition, or price your own preparation explicitly. Don't let ready trays survive as a footnote nobody owns.
21分The guarding allowance also needs its scope stated. Does it include the application assessment and resulting integration work, or only the physical panels shown in the drawing?
21分One includes assessment and integration through the named integrator; the other prices panels only and excludes the remaining work. I have asked that integrator for a separate defined proposal.
16分Count the presentation trays and their change parts too, especially if one offer prices a single demonstration set and the other has enough to keep production supplied.
1分Who owns training for the actual operator tasks, including tray preparation and an interrupted order? The word training can hide a pendant tour.
14分That is another mismatch. First offer has an operator handover for our job; second offers one general session at the supplier. We need relief cover trained on the actual arrangement as well.
2分I'd let your own trainer cover the relief shift if that's workable, Anil, but cost their preparation and the practical checks. Supplier attendance twice isn't the only honest option.
19分Agreed. I am costing supplier handover to our trainer plus two local operator sessions, with the actual recovery examples included. We have the staff for that, not unlimited spare time.
4分Separate firm prices from estimates in the comparison. An estimated integration cost can be useful without being presented as a supplier commitment.
12分And mark who updates each estimate. I have seen provisional tooling numbers become ancient simply because everyone assumed purchasing was waiting for someone else.
19分Tooling owns the presentation estimate, integrator owns the assessment and integration proposal, and I own the training allowance. Each line now says firm, estimate or unanswered, with the specific next answer required.
4分Has the second supplier priced preparing your real incoming boxes yet? That's still the bit I wouldn't let disappear behind an impressively complete spreadsheet.
7分They will not include it. They have confirmed that exclusion in writing, so our toolmaker's preparation concept and staff estimate sit beside their offer. Its apparent saving has nearly disappeared.
17分Does the remaining difference justify splitting responsibility for that presentation arrangement? A small saving can still be real, but somebody needs to own the interface when it misbehaves.
17分Mina, I would not automatically penalise split responsibility if their integrator accepts the combined design. Ask whether that is included before pricing a permanent coordination problem.
20分Jasper's right to ask. We use separately sourced change parts successfully, but only because one designer owns the assembled arrangement and its references.
13分The integrator has priced ownership of that combined design, and purchasing compared both complete options. We have selected the first supplier for the paid detailed-design stage: the residual difference was smaller than the added coordination work. Remaining estimates are still marked, not rolled into a pretend fixed installation price.
18分Useful result. Did purchasing keep the rejected option's completed comparison? It will save repeating this when somebody rediscovers the cheap arm price.
4分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .