the shared pallet section still shows yesterday's carton

RebeccaArcher0430 · 2025年12月18日 13:19 UTC

已关闭
RE
RebeccaArcher0430
I have packaging support and finger withdrawal on one UR5e section now, but the case construction is the old version with different internal supports; how do I keep the useful combined review without allowing its old support marks to approve the cartons dispatch actually receives?

11 条回复

MA
MayaAdams0127

Have packaging mark the required support for the actual packed construction, then let tooling check withdrawal against those marks on the same revised section; don't just change the carton name.

4
RE
RebeccaArcher0430

Packaging has identified the current construction. The old support marks sit under a different part of the contents, so they cannot simply carry across. Tooling still has the old section marked accepted.

0
FE
FelixAdams0110

Then keep that acceptance tied to what tooling actually reviewed, Rebecca; it shouldn't become a blank signature for a section whose carton and bearing areas are about to change

6
MA
MayaBarnes0562

Are old and new cartons both still arriving?

6
OS
OscarAbbott0010

Maya Barnes's question matters to the operator instruction too. A replacement drawing for the new carton may not tell dispatch what to do with old stock still waiting beside the station.

6
RE
RebeccaArcher0430

Only the current carton arrives now, Maya Barnes; the old stock is exhausted, so I don't need a two-carton process, just the right review for the one we use

22
MA
MayaAdams0127

That narrows it. Is the toolmaker reviewing the changed bearing areas as a new constraint, or only checking that the external carton outline is unchanged?

10
FE
FelixAdams0110

External outline staying the same is exactly how this sort of change looks harmless in a top view, while the important support underneath has moved

11
RE
RebeccaArcher0430

Toolmaker has acknowledged the changed bearing areas. A lower-count pattern and a different withdrawal concept are proposed, neither accepted. Integrator owns the combined revision and the eventual operator drawing.

7
OS
OscarAbbott0010

Keep the full-order handling and partial-pallet work in that comparison. Changing the layer can move effort into dispatch even if both candidates eventually satisfy support and clearance.

13
MA
MayaBarnes0562

Will dispatch review both candidates before either is priced as the chosen method?

5