简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The UR5e panel demo starts after someone separates the sheet

AnnaArcher0416 · 2026年3月4日 03:19 UTC

已关闭
AN
AnnaArcher0416
The vacuum report shows one thin aluminium panel held successfully. Our supply is a stack. No separation check, no view of the unsupported edge reaching the nest. I want the supplier to show the actual starting and finishing conditions before we accept this tool.

3 条回复

CH
ChenChan1051

Did they test from a stack at all?

20
AN
AnnaArcher0416

No. They confirmed the panel was placed alone on the bench. Revised trial brief now names stacked supply, single-panel confirmation, support during transfer and release into our nest.

12
CH
ChenChan1051

Include what happens with two panels. Detecting a double is not the whole response.

19

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .