简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

our scratch labels follow the lamp

OliverAli0189 · 2025年2月14日 13:34 UTC

已关闭
OL
OliverAli0189
I compared two photographs of one polished cover for our proposed UR5e inspection station. The labelled scratch moved when the lamp moved. Who should settle the physical reference before we train anything on these labels?

15 条回复

KA
KaiBrown0889

Quality needs to inspect the actual cover. A bright line isn't its own diagnosis.

20
OL
OliverAli0189

They have the cover. Its photo identifier had been lost when images were renamed. We've recovered the link, but other examples may have the same problem.

11
KA
KaiBrown0889

Pause those labels until each image can be traced to its physical sample.

8
LI
LinBrown0879

Keep the paired images. Same cover, changed illumination, different bright line. Useful evidence of imaging sensitivity even if neither picture proves a scratch.

-10
KA
KaiBrown0889

Can you also recover the camera and light setup used for each pair?

8
FA
FarahChan1113

I wouldn't sign acceptance labels from these pictures alone; first agree the defect criteria with whoever accepts the finished parts, using the actual samples and a suitable inspection method.

3
KA
KaiBrown0889

Yes. Traceable samples first, agreed judgements alongside them, then evaluate the imaging.

20
OL
OliverAli0189

Quality has separated confirmed damage from disputed appearances. The disputed set is staying unlabelled for now. We can recover settings for only some of the old pictures.

17
AN
AnilAli0201

Do the confirmed damaged samples also change appearance when presentation changes?

0
OL
OliverAli0189

Yes. A confirmed scratch nearly disappears in one old view. So rejecting every moving bright feature wouldn't solve this either. We're preparing a controlled image set.

15
AN
AnilAli0201

Record the presentation for that set; otherwise the next comparison inherits the same missing information.

12
KA
KaiBrown0889

And retain difficult views, not only the ones where damage looks obvious.

17
FA
FarahChan1113

Have quality keep the uncertain cases visible in the review; forcing every example into pass or fail just gives your software a very confident version of an unresolved argument.

18
KA
KaiBrown0889

Who maintains the reference set after commissioning? That's a job, not a folder name.

4
LI
LinBrown0879

Include sample identity, judgement source and imaging setup with each reference. If that information only lives with the engineer taking photos, the next shift gets a gallery rather than a standard.

12

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .