Ask for representative stacked material and the receiving fixture in the trial, with the proposed single-panel check and failure response stated. A loose sheet on a bench has an admirably simple supply chain; yours doesn't
Then keep that method open in the proposal. Also ask who removes any interleaves and replenishes the stack, because someone eventually has to do the work the seal report never mentioned