I'm not ready to choose the FR5 for our aluminium blank. The sketch proves somebody can draw a line to the fixture, but it leaves out the gripper and open door. I'd like a measured access check before spending money on a stand that might block the setter too.
Ask for the complete tool and held blank through removal and withdrawal, combined with a surveyed open door and the setter's changeover space. Keep the same assembly revision in every candidate layout.
Requested from the integrator. Toolmaker is supplying the assembly; maintenance is measuring the opening. I've asked the setter to mark his work space before the first combined drawing comes back.