FR10 sleeve handover plan: machine supplier says ready is request received, integrator says loading area available. I need to get this argument onto a sequence both can review. These are ordinary interface states, not the safety permission design.
They can, and they give opposite ready values for that case. I've put their answers side by side and proposed separate receipt and availability meanings. Neither team has signed the resulting sequence yet.